PROJECTS
Latest Projects
Construction of Metro rail Project
-
Project Name: Ahmedabad Metro Rail Project Phase -1, Depot Plant and Machineries (Project value: 6000 Lakh INR)
-
Year: 2018-2021
-
Location: Ahmedabad ( Apparelpark Depot and Gyaspur Metro Depot)
-
Client: GMRCL- (Gujarat MEtro Rail Corporation limited)
-
Main Project Features:
-
Major Equipment’s includes Under floor wheel lathe, synchronized mobile and pit lifting jacks, Electric bogie tractor and electric shunter, Rail cum Road vehicle, Rescue equipment’s, Train wash plant, Electric locomotive, Bogie turning table, Air compressor etc.
-
Contract administration of machinery and plant works
-
Position Held: Section Engineer- Depot Plant and Machinries
Construction of Bio Safe Laboratory Project
-
Project Name: Construction of Biosecurity Laboratory building with HVAC and allied services at IVRI, Bangalore (Project value: 1800 Lakh INR)
-
Year: 2012-2015
-
Location: NIVEDI Campus, Yelahanka, Bangalore
-
Client: NIVEDI (ICAR- Indian Council of Agricultural Research)
-
Main Project Features: as a site engineer execution of turnkey green field project for construction of NIVEDI institute comprising Administration, Laboratory, ETP, service block which includes various works e.g. Civil works, internal electrification and industrial electrical. Substation 500 KVA, , HVAC and BMS system, Laboratory equipment’s, Clean room, ETP, Water purification plant etc.
-
Position Held: Dy. Manager (HVAC)
Operation and Maintenance of utility systems
Planning and execution of operation and maintenance activities, preventive maintenance schedule for HVAC and allied utilities. e.g.
-
Chilling plant(1800TR),
-
Air compressor 1500 cfm
-
Nitrogen plant ,
-
water treatment plant,
-
Hot water and steam system etc.
-
Air handling units -120 Nos.
Design and Engineernig of Injection molding machine elements
Development of CAD 2D&3D machine assembly drawings for continuous improvement of machine elements.
sheet metal machine base design.